Site Plans are to include the following:
- The Operators signature
- For any permits associated with a well (pipeline, steam generator, flare et.) the coordinates of the well
- Rig layouts showing proposed signage and lighting
- The required 3,200-foot HPZ buffer in addition to the 4,000-foot buffer
- The proposed well depth
- The well depth should be the same depth included with the NOI package submitted to CalGEM